Monday, 8 October 2012

Commonwealth Games Village Energy Centre

In my role as Chair of the Energy and Carbon Working Group, I was able to make a visit to the Energy Centre which is part of the Legacy of the Commonwealth Games in 2014.

I was provided with a tour of the building and given information about the CHP engine, 3 boilers and a thermal store at the Energy Centre from a representative of Vital Energi.

Vital Energi carry out the design, installation, commissioning, testing and operation of the scheme until its eventual post Games completion in 2016.  There is capacity for a future CHP engine, boiler and thermal store.


View of the exterior of the energy centre

The CHP Engine inside the Energy Centre

All the heating and hot water for the development goes through special pre-insulated pipework. Initially, it will connect the Emirates National Indoor Sports Arena, Sir Chris Hoy Velodrome, a Care Home and 704 domestic properties which are to be used as athletes' accommodation before and during the Games. 

Useful link:-


No comments:

Post a Comment

Note: only a member of this blog may post a comment.